RAIL MOUNTED GANTRY CRANE

Date 2024-09-09

SWL:                          50~200t

Span:                         18~45m

Hook Path:               9~30m

Duty Grade:              A5.M5   


Lifting Speed:           0~0.8/2 m/min (VFD 4-speed)

Cross Speed:             0~12/25 m/min (VFD 4-speed)

Long Speed:              Rated Load: 0~12/20 m/min (VFD 4-speed)

                                    No Load: 0~20/32 m/min (VFD 4-speed)

Control mode:          WR. + PLC + HMI + VFD